Cost allocation with limited information
Publikation: Working paper › Forskning
Standard
Cost allocation with limited information. / Hougaard, Jens Leth; Tind, Jørgen.
Department of Food and Resource Economics, University of Copenhagen, 2013.Publikation: Working paper › Forskning
Harvard
APA
Vancouver
Author
Bibtex
}
RIS
TY - UNPB
T1 - Cost allocation with limited information
AU - Hougaard, Jens Leth
AU - Tind, Jørgen
PY - 2013
Y1 - 2013
N2 - This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.
AB - This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.
M3 - Working paper
T3 - MSAP Working Paper Series
BT - Cost allocation with limited information
PB - Department of Food and Resource Economics, University of Copenhagen
ER -
ID: 105343690